1.
The construction documents submitted with the permit application for a demolition must be accompanied by a site plan that shows the ________.
2.
True or False: Where conflicts occur between the provisions of the IRC and the referenced codes and standards, the provisions of the IRC must apply.
3.
If there is a conflict in the IRC between a general requirement and a specific requirement, which requirement is applicable?
4.
The construction documents submitted with the permit application must be accompanied by a site plan that shows the ________.
5.
Permits for temporary structures must be for a max. of ________.
1 out of 3
6.
The certificate of occupancy must include the ________.
7.
A permit is not required for one-story detached accessory structures, so long as the floor area does not exceed ________.
8.
True or False: Appendix chapters in the IRC are optional and not applicable unless specifically adopted.
9.
True or False: The building official must not grant modifications to any provisions required in flood hazard areas under any circumstances.
10.
Any person who erects, constructs, alters or repairs a building or structure in violation of ________ is subject to penalties as prescribed by law.
2 out of 3
11.
The building official must keep official records, permits and certificates issued for ________.
12.
Electrical wiring, devices, appliances, apparatus or equipment operating at less than ________ and not capable of supplying more than 50 watts of energy, does not require a permit.
13.
Unless otherwise stated, ________ to any structure must conform to the requirements for a new structure without requiring the existing structure to comply with the new requirements.
14.
The inspection of a foundation must be made after ________.
15.
The individual in charge of the department of building safety is referred to as the ________.
3 out of 3